Question
I have set up a Schedule Job executed every 5 minutes.
In the Monitoring logs, some logs of [HULFT Integrate] were not output, the logs of [Schedule Job] were output though.
Please tell me why the script was not executed even though the Schedule Job ran as planned.
Answer
The script registered to the schedule job might have not executed because the schedule job was running during a restart of the Integrate service due to a lack of resources.
If this event occurs repeatedly, the resources might lack chronically.
Please consider increasing resources of the Integrate service or reviewing the process flow.
If you would like to confirm the resource usage status at the time of the event, please provide the following information to the Technical Support Center.
-Date and time when the event occurred
-Pod-ID of the Integrate service
Please refer to the following FAQ to obtain the Pod-ID.
How to check your Pod-ID
Comments
0 comments
Article is closed for comments.